Freightliner Photo Gallery

Scan005, September 14, 2002

After deciding on the wheelbase I wanted, it took 7 hrs of drilling approximately 40 holes in the frame to make the change from spring suspension, to air ride suspension. I wanted to make everything as close to the factory specs as possible.